Skip to content
Aobotics HOTEL ROBOT INTEGRATION

Guide / Deployment

Hotel robot deployment checklist

Response within 24 hours · Warranty: 12 months

Reviewed by Aobotics Project Team

Quick answer

Before go-live, confirm 20 items across five groups: building access, network, routes, systems and people. The most common failures are an untested lift exception, a Wi-Fi dead spot and no named owner for exceptions. Use this list in the site survey and again at acceptance.

Hotel robot deployment checklist — factory product photo
Checks
20
Groups
5
Acceptance sign-off
1
Warranty
12 mo

Group 1

Building access checks

Lift, doors and the service route.

Building access
#CheckEvidence
1Lift controller model and interface confirmedSurvey record
2Lift vendor permission for the chosen methodWritten approval
3Service lift priority rule agreedOperating procedure
4Fire-mode behaviour and robot rule documentedFire procedure
5Service doors and thresholds passableRoute test

Group 2

Network checks

Coverage where the robot actually drives.

Network
#CheckEvidence
6Wi-Fi coverage in the service core and lift lobbySite survey
7Wi-Fi coverage in guest corridorsSite survey
8Roaming between access points testedWalk test
9Network segmentation and firewall rules agreedIT sign-off

Group 3

Route and safety checks

Map the exception, not only the shortest path.

Routes and safety
#CheckEvidence
10Floor map validated on siteMap review
11Corridor pinch points and blind corners markedRoute test
12Emergency stop and manual override demonstratedStaff sign-off
13Night route and lighting reviewedNight walk

Group 4

Systems checks

PMS, PABX and the task queue.

Systems
#CheckEvidence
14PMS read-only access testedTest record
15PABX room-call trigger testedTest record
16Fallback queue works without PMS/PABXDrill

Group 5

People and acceptance checks

A named owner and a signed acceptance.

A checklist without evidence is a wish list. Keep the signed record with the handover documents and review it after the first month.

People and acceptance
#CheckEvidence
17Front desk trained on task creationTraining record
18Housekeeping trained on loading and checksTraining record
19Duty manager trained on escalation and overrideTraining record
20Acceptance test passed and signedSigned record
Factory product photo
Factory product photo

Frequently asked questions

Frequently asked questions

Response within 24 hours · Talk to an engineer

When should the checklist be used?

Use it twice: during the site survey to identify gaps, and at acceptance to confirm each item with evidence. The second pass should be signed by the property and the supplier.

What is the most common failure?

An untested lift exception. Teams test a normal call but not a busy lift, a door obstruction or a fire-mode simulation. The second most common is a Wi-Fi dead spot in the lift lobby or a corridor corner.

Do we need a pilot before full rollout?

Yes. A two-to-four-week pilot with a written scorecard is the lowest-risk way to validate the route, the lift rule and the staff workflow before adding units.

Who signs the acceptance?

The property’s project owner and the supplier’s deployment lead. The record should include the tests performed, the results and any open items with an owner and a date.

What if an item cannot be completed?

Document it as an open item with an owner and a date, and decide whether it blocks go-live. Some items, such as a night walk, can be completed after the pilot starts; a lift exception test should not.

Aobotics

Use the checklist in your survey

Send the completed checklist and we will mark the gaps before the quote.

  • Response within 24 hours
  • Talk to an engineer
  • Warranty: 12 months

Tell us about your property

Share your property and the task. We reply with a configuration and a scoped quotation within 24 hours.

Fields marked * are required. We use your details only to answer this inquiry.